|
After a long period of preparation for the ISO 9001:2015 certification, finally the Batch 1 composed of Administration Division, Machinery Division, Kobe Division, I & C / C & E Division, and System Engineer-ing Section passed the Stage 2 certification audit con-ducted by TUV – SUD.
|
October 24 and 25, 2016 marked the memorable date for Batch 1- Stage 2 audit highlighted with suspense and nervy feelings brought about by the positive and negative expectations and scenarios of the audit re-sults. After receiving the audit plan for Stage 2 Audit almost everyone is asking who will be the named 4 auditors who will be assigned to their division/section to conduct the audit as observed during the Stage 1 audit. Since most of the Batch 1 auditees were known to them the identity of the previous auditors during the Batch 1 Stage 1 audit to having their own style of auditing based on their field expertise and experi-enced as quality system auditor. As known to every employee of MTS the stage 2 audit is the most critical, crucial and hardest part of the audit scene for this covers the implementation stage and requires evidences of records for justifications.
|
The involvement and commitment of every employee on this project is the key determining factor of suc-cess for this certification audit. That's why the gained success in acquiring this certification for ISO 9001:2015 would be a memorable experienced of a
total commitment, initiative, team works and involve-ment towards the attainment of our goal which is to be an ISO 9001:2015 certified engineering design and technical services company.
|
We can finally say a Big Congratulations! Hurray to Batch 1 for a job well done…
|
And most of all for the big support of the top manage-ment for this QMS project with the assistance of QMS administrator, QMS section and to mentioned the System Engineering Section for the system generated program on documentation management.
|